A summary of each of the Company’s Projects is detailed in the following table. The table does not include Mineral Resources from Bikini, Andersons and Watta/Warwai deriving from Paladin’s 82.08% ownership of Summit Resources Ltd or the 100% owned Duke Batman and Honey Pot deposits.

Project Overview Mining Method/
Deposit Type

Outlook

Resources
Uranium Mines
**Langer Heinrich Mine - 75%
(Namibia, Southern Africa)

The Company’s cornerstone asset commenced production in 2007. The Stage 3 expansion is complete with production at 5.2Mlb per annum (pa). Studies are underway to further optimise production.

Conventional open pit; calcrete Currently on 'care and maintenance' due to low uranium price M&I (inc stockpiles)

116.1Mt @ 0.046% (118.9Mlb U3O8)

 

 

Inferred:

8.7Mt @ 0.0468% (9Mlb U3O8)

*Kayelekera Mine - 100%
(Malawi, Southern Africa)
Paladin’s second uranium mine, capable of operating at near nameplate of 3.3Mlb pa. Conventional open pit; sandstone Currently on 'care and maintenance' due to low uranium price M&I (inc stockpiles)

15.0Mt @ 0.072% (23.9Mlb U3O8)

Inferred:

5.4Mt @ 0.06%(7.4Mlb U3O8)

Uranium Development
*Aurora Project - 100%
(Labrador, Canada)
Paladin’s first entry into Canada. Resource definition and additional exploration commenced in the second half of calendar year 2012. Open pit - underground; metasomatic

Maintain on a care and maintenance basis

M&I:

53.7Mt @ 0.09% (108Mlb U3O8)

Inferred:

17.4Mt @ 0.09% (35Mlb U3O8)

**Manyingee Project - 100%
(Western Pilbara, Western Australia)

Resource definition and extension drilling at Manyingee completed in 2012.

In-situ recovery; sandstone

Maintain on a care and maintenance basis

M&I:

8.4Mt @ 0.09%
(15.7Mlb U3O8
)

Inferred:

5.4Mt @ 0.09%
(10.2Mlb U3O8
)

*Valhalla, Skal & Odin Deposits – 91.04%
(Queensland, Australia)
Paladin’s primary Australian asset. Efforts are ongoing to develop a flow sheet and expand the resource before moving towards a Feasibility Study. Open pit - underground; metasomatic

Maintain on a care and maintenance basis

M&I:

Inferred:

57.2Mt @ 0.07% (93.7Mlb U3O8)

16.3Mt @ 0.06% (22.0Mlb U3O8)

 

Mineral Resources are quoted inclusive of any Ore Reserves that may be applicable.
Mineral Resources detailed above in all cases represent 100% of the resource – not the participant’s share.
*Conforms to JORC(2004) guidelines, in addition the Mineral Resources for the Michelin and Jacques Lake deposits conform to the JORC(2012) guidelines.
**Conforms to JORC(2012) guidelines.
(a) For Kayelekera, the Government of Malawi holds a 15% equity interest in the subsidiary, Paladin (Africa) Limited, the holder of the Kayelekera Mining Licence.
(b) For Michelin, the Michelin Claimants will receive a 50% participating interest in the Michelin Project.
Langer Heinrich and Kayelekera Mineral Resources have been depleted for mining to the end of June 2018 and June 2014 respectively.

Latest prices

ASX A$ 0.20

Latest Prices